Services — Product Development / 03
No surprises at shipment.
Once goods are at port, there's no reversing. That's why our inspector is inside the factory at three critical points — before production starts, mid-run, and before shipment. AQL sampling, photo reports, defect classification. You approve the shipment; we make sure you have full visibility to do it confidently.
01
Concrete outputs.
What we deliver
— 01
Pre-production inspection (PPI)
Raw material + machine readiness check.
— 02
During production (DUPRO)
Mid-production check at 20–60% point.
— 03
Pre-shipment inspection (PSI)
Final AQL sampling.
— 04
Report pack
Photo + video + defect classification report.
02
How it goes.
Process
— 01
Plan
Inspection points along the production schedule.
— 02
PPI
On-site at production start.
— 03
DUPRO
Mid-production check.
— 04
PSI
Pre-shipment final.
Adjacent services.
Goes well with